-
- +86-130 5919 0518
- 008613059190518
- sales@super-steels.com
Oil casing pipes play a critical role in supporting and securing oil wells. Their proper installation is essential to ensure well integrity and long-term production safety. This article provides a detailed overview of the installation and lowering methods commonly used for oil casing pipes.
Super Steel Manufacturing Co.,Ltd is professional OCTG pipes manufacturer, for more details, please contact:sales@super-steels.com
Installation Methods for Oil Casing Pipes
1. Standard Casing Installation
This is the most widely used method. Once drilling is completed, the casing pipes are inserted into the wellbore section by section. They are connected through threading or welding, depending on the design. Specialized casing handling tools and equipment are employed to ensure smooth insertion and secure connections.
2. Cementing Operations
After casing is set in place, cementing is performed to fill the annular gap between the casing and the borehole wall with cement slurry. This step stabilizes the casing, prevents fluid migration between formations, and ensures long-term zonal isolation. Proper cementing equipment and materials are essential for achieving high-quality cement bonds.
3. Specialized Installation Techniques
In complex well types such as horizontal wells or extended-reach wells, conventional methods may not suffice.
In horizontal wells, coiled tubing-assisted casing installation may be used.
In extended-reach wells, a rotary guide system can help navigate the casing through long horizontal sections with high friction.
Methods for Lowering Oil Casing Pipes
1. Conventional Lowering Methods
a. Single Joint Installation
This traditional method involves lowering individual casing joints one at a time. Each joint is connected at the wellhead via threading, followed by tightening to ensure a secure fit. Equipment such as a drawworks, traveling block, and elevators are used. While highly adaptable for varying well depths and conditions, it is relatively time-consuming.
b. Double or Multi-Joint Installation
To increase efficiency, multiple casing joints can be preassembled on the surface before being lowered into the well simultaneously. This reduces the number of threading operations at the wellhead and shortens the overall installation time. However, this method demands higher lifting capacity, precise alignment, and stringent quality control for connections.
2. Specialized Lowering Methods
a. Floatation Method
This technique introduces lightweight drilling fluid or gas into the casing interior to enhance buoyancy and reduce drag during lowering. It is particularly effective in high-angle, horizontal, or deep wells where frictional resistance is significant. Once the casing reaches target depth, the lightweight fluid is displaced with standard drilling mud through circulation.
b. Rotational Lowering Method
This method involves slowly rotating the casing as it is lowered into the well. Rotation reduces friction between the casing and the wellbore, improves centralization, and enhances cementing quality. Special rotating heads and casing-running tools are required, along with careful control of drilling fluid properties and wellbore stability.
c. Hydraulic Installation Method
Using a hydraulic power system, casing is pressed into the wellbore by applying downward force. This technique is particularly useful in hard rock formations or constrained environments where conventional hoisting methods lack sufficient power. Although effective, hydraulic systems are complex and typically involve higher costs.
Conclusion
There are multiple methods available for installing and lowering oil casing pipes, each suited to specific operational scenarios. The choice of method should be based on well design, formation characteristics, and operational requirements. Regardless of the technique used, it is essential to follow established procedures and safety protocols to ensure the integrity of the casing and the success of the well operation.