Factors affecting the price of SCH 40 seamless steel pipe

Product News

SCH 40 seamless steel pipe, SCH 40 pipe price

Send Email
Factors affecting the price of SCH 40 seamless steel pipe

Date:2025-12-31

What Determines the Price of SCH 40 Seamless Steel Pipe?

The price of SCH 40 seamless steel pipe is not fixed by “Schedule 40” alone.
It is jointly determined by material grade, pipe size, production process, market supply and demand, logistics, and regulatory costs.

 

Key Factors Affecting SCH 40 Seamless Pipe Price

1. Raw Material Cost (Primary Driver)

Steel billet price is the core cost baseline for SCH 40 seamless pipes.
Any fluctuation in iron ore, coke, or alloy premiums is directly reflected in finished pipe pricing.

Every RMB 100/ton increase in billet cost typically leads to a similar increase in pipe price.

Alloying elements such as Cr and Mo significantly raise production cost.

 

Typical material price comparison:

Carbon steel: lowest cost, most widely used

Alloy steel: ~2–3× carbon steel

Stainless steel: ~4–8× carbon steel (high Ni & Cr content)

 

2. Pipe Size & Manufacturing Process

Larger diameter and thicker wall SCH 40 pipes cost more due to higher material usage and lower forming efficiency.

Key impacts:

Non-standard sizes (e.g., DN65, DN90): require customized rolling → 10–30% higher price

Small diameter pipes (< DN25): higher processing cost per ton

Large diameter pipes (> DN200): lower yield efficiency and higher tonnage cost

Fixed length (e.g., 12 m) pipes usually carry a price premium over random length

 

Process-related cost differences:

Hot-expanded seamless pipes: 10–15% higher cost than ordinary welded pipes due to better wall uniformity

Cold-rolled seamless pipes: equipment depreciation and energy consumption account for 20–30% of processing cost

 

3. Market Supply and Demand

SCH 40 seamless pipe prices rise during demand-intensive project cycles.

Typical demand drivers:

Energy infrastructure expansion

Chemical plant upgrades

High-pressure boiler and corrosion-resistant applications

 

Order volume effect:

~200 tons: ~2% negotiable discount

≥500 tons: additional 3–5% mill-level discount may apply

 

4. Logistics & Trade Policy

Transportation and trade policies can significantly alter final delivered cost.

Long-distance inland transport or sea freight increases unit price

Import tariffs and anti-dumping duties may raise prices by 20% or more in some regions

 

 

5. Surface Treatment & Certification Requirements

Additional technical requirements add cost beyond base pipe pricing.

Standard pickling or phosphating: minimal cost impact

Galvanizing, powder coating, or electrochemical polishing: significant cost increase

Certifications such as API 5L, PED, or nuclear-grade inspections introduce compliance premiums

 

Summary

SCH 40 seamless steel pipe pricing depends on material grade, pipe dimensions, production process, market demand, logistics, and certification requirements—not on Schedule 40 alone.

 

FAQ

Q1: Is SCH 40 a fixed price specification?
No. SCH 40 defines wall thickness, not material grade or manufacturing cost.

Q2: What is the biggest cost factor for SCH 40 seamless pipes?
Steel billet and alloying element prices are the primary cost drivers.

Q3: Do non-standard sizes cost more?
Yes. Custom sizes typically increase prices by 10–30%.

Q4: Why do alloy and stainless SCH 40 pipes cost much more?
Because Cr, Mo, and Ni significantly raise raw material and processing costs.