The acceptance methods and steps for Longitudinal Submerged Arc Welding (LSAW) steel pipes typically involve rigorous inspection to ensure the pipes meet both the required specifications and safety standards. Below are the key acceptance methods and steps involved in the process.
1. Visual Inspection
Purpose: To check the surface quality and overall appearance of the pipe.
Steps:
Inspect the entire length of the pipe for any visible defects such as cracks, dents, or signs of corrosion.
Ensure proper alignment of the pipe and the absence of excessive weld reinforcement or undercuts.
Inspect the pipe ends for any irregularities, such as misalignment or deformation.
2. Dimensional Inspection
Purpose: To verify that the pipe dimensions (diameter, wall thickness, length, and out-of-roundness) comply with the specified standards.
Steps:
Measure the outside diameter (OD), wall thickness, and length of the pipe using calibrated measuring tools.
Check the roundness of the pipe to ensure it does not deviate from specified tolerances.
Verify that the pipe length meets the contract or project requirements.
3. Weld Inspection
Purpose: To evaluate the quality and integrity of the longitudinal weld seam.
Methods:
Ultrasonic Testing (UT): To detect internal defects such as porosity, voids, or cracks within the weld zone.
X-ray or Gamma Ray Testing: For detecting internal defects and ensuring that the weld quality meets the required standards.
Magnetic Particle Testing (MT): For detecting surface or near-surface cracks and other imperfections in ferromagnetic pipes.
Visual Weld Inspection: The weld bead should be checked for consistency, proper penetration, and smoothness.
4. Hydrostatic Testing
Purpose: To test the pipe's ability to withstand internal pressure and ensure it is free from leaks.
Steps:
The pipe is filled with water and subjected to internal pressure, typically 1.5 times the design pressure.
The pipe is monitored for any signs of leakage, which would indicate a failure.
The test is considered a pass if no leakage is observed during the specified pressure test duration.
5. Tensile and Mechanical Testing
Purpose: To verify the mechanical properties (strength, ductility, toughness) of the steel.
Tests:
Tensile Test: To assess the yield strength, ultimate tensile strength, and elongation of the steel.
Impact Test: To check the pipe's resistance to low-temperature brittleness.
Hardness Test: To confirm the hardness values meet the specified requirements.
6. Chemical Composition Test
Purpose: To ensure that the chemical composition of the steel pipe meets the requirements of the material specifications.
Steps:
Samples of the pipe material are taken for chemical analysis.
The results are compared to the material's specified composition, focusing on elements such as carbon, manganese, sulfur, phosphorus, and other alloying elements.
7. Flattening and Bending Tests
Purpose: To assess the pipe’s ability to withstand mechanical deformation without cracking or other defects.
Steps:
Flattening Test: A pipe section is flattened between two plates to a specified reduction in height and checked for cracking.
Bending Test: A section of the pipe is bent at a specified angle to test the pipe’s flexibility and resistance to cracking.
8. Coating and Surface Treatment Inspection
Purpose: To ensure that the external and internal coatings (if applicable) are applied correctly.
Steps:
Inspect the quality and thickness of the coating, whether it is for corrosion resistance or other protective purposes.
Ensure that the coating is uniform, without visible defects such as bubbles, pinholes, or excessive coating buildup.
9. Documentation and Certification
Purpose: To verify that all tests have been completed and documented according to the specifications.
Steps:
Review and verify the test reports, certifications, and inspection records to ensure all requirements have been met.
Provide the necessary certificates of compliance and batch numbers for traceability.
10. Final Acceptance
Purpose: To confirm that the pipe meets all project or contract specifications and is ready for use.
Steps:
Review all inspection results and compare them with the acceptance criteria.
If all requirements are satisfied, the pipe is officially accepted and ready for shipment or installation.
By following these steps, LSAW steel pipes are ensured to meet the high-quality standards required for their intended applications, which may include use in pipelines, construction, or offshore platforms.